Friday, June 26, 2015

Eastwood Trailwork Mon. 6/29 at 6pm

Well around here we are alternating between Mud Bogs and Jungle out on the trails.   Can't do much about the rain currently, but we will try to do a little something about the overgrowth.  If your interested in helping meet at Eastwood on Monday at 6 pm in the big parking lot.  Bring water and gloves.  I will have tools and will be bring two large brush cutters (husqvarna and Gravelly ) to add a little muscle to the work.  If you can make it I sure would appreciate it.  We usually only have to do eastwood twice a summer so really not that much work. 

Gamehaven update;
There has been some work being done at eastwood.  There are two new short sections of trail near the begining if your riding from the upper scout lot.  The first allows you to miss one of the mud holes on the wide trails and the second smooths out the transition into the first section of singletrack.  This is the recommended way to ride the trail right now as the lower entrance from the DNR parking lot is really over grown and we couldn't get in there to trim it because it was simply too wet.  See the map pictured.  I circled the new detours in blue and marked the really overgrown and wet section with slashes.  The new section has been getting worked on and is about 1/2 rough cut.  Watch for future work dates on that. 

No comments: